Groundworks Prior to Modular Unit Installation


Civil Engineering groundworks project.
Working at a school, we were required to prepare and carry out all groundworks prior to the installation of modular units being put into place. The project involved preparing the ground prior to pumping concrete, installing concrete pads and then positioning the modular units on the pads using a crane.

Ready to Break the Silence?
Our friendly team are ready to help you. Call us now for a chat on 01604 808070